The concrete surface must be sound, clean, free of grease, oil and dust Residue, weak layers must be removed. Gaps, potholes and cracks should be repaired with suitable Polymex
should be repaired with mortars. If necessary, milling machines and dry wiping machines should be used on the concrete surface. Application surfaces may be damp or wet but there should be no puddles of water.
First mix colored component A, then add hardener to component B and mix thoroughly (for 2-3 minutes) until a homogeneous mixture is obtained.
is mixed. It can be applied by brush, roller or spraying method. After the first coat is completely dry (24 hours), the second coat can be applied.
Application tools should be washed with plenty of water while the material is still wet.
Reviews
There are no reviews yet.